The HVAC systems in the Erbil Gas Power Project, which is built on an area of 750,000 m² and has a power of 1500 mw, has provided ventilation ducts and insulation material.
Temsa Engineering Shipbuilding, Insulation, Ventilation and HVAC Systems.