26 pieces of Adiabatic Cooler Unit was installed on the roof of the factory in order to cool down the various production areas and to increase the working efficiency of Türk Pirelli A.Ş.

Our job description as Temsa Engineering:

A 6-way diffuser was installed to ensure the distribution of air to the air vents drawn into the factory. Furthermore, the initial investment and operating costs of the application provided a more economical and rapid solution than a central air handling unit project.

                                                       Temsa Engineering Ship Building, Ventilation and HVAC Systems.