Emaar Square

HomePage Emaar Square

Emaar Company has signed a contract for Generator Room Acoustic Sheet and Acoustic Grill on EMAAR SQUARE project, which was built by Tav - Sera as the main contractor in Üsküdar / Libadiye.

Within the scope of business;

Modular construction panels were produced by placing 70 kg / m3 rock wool between aluminum plates on top of the steel constructions on the Generator Room with 16 generators. In addition, acoustic grille assemblies were made to allow the air required for the generators to enter the room. As a result of these studies, the sound was reduced to 24 dB and reduced to below 55 dB.

                                                       Temsa Engineering Ship Building, Ventilation and HVAC Systems.